Search
Thursday, September 09, 2010 ..:: Local News ::.. Register  Login
Membership Membership:
Latest New User Latest: bayoujen
New Today New Today: 0
New Yesterday New Yesterday: 0
User Count Overall: 1791

People Online People Online:
Visitors Visitors: 9
Members Members: 0
Total Total: 9

Online Now Online Now:
 Top News Minimize
May 24

Written by: jserigny
5/24/2010 11:04 AM

Upload Your Oil Spill Photos

Have photos of the oil spill impacting our coast? You can upload them to our website here.

You can use our uploader and they will appear on our site once our moderator approves them. Click Here to go to that web page.

Tags:

1 comments so far...

what needs to be done and how to stop the oil in the gulf

BP GULF BLOW OUT

I HAVE SENT SEVERAL E-MAIL OUT ON HOW AND WHAT,NEEDS TO BE DONE TO STOP THIS .I HAVE 35 YEARS IN THE OIL FIELD ALL OVER SEAS I HAVE ALL DOCUMENTS TO PROVE MY CLAM ON FIXES THIS OIL BLOW OUT THAT HAS OCCURRED.NOW THAT BP HAS CUT OFF THE RISER WE ALL KNOW THAT WE ARE WIDE OPEN TO THE BOTTOM OF THE OCEAN FLOOR THE WAY IT STANDS NOW.WHAT NEEDS TO BE DONE AND CAN BE DONE IS AS FOLLOW ,YOU DON'T NEED A SUB SEA STACK A 15,000 BOPS SURFACE STACK DOUBLE GATE DRESSED WITH BLIND RAMS ON TOP AND BOTTOM OF THE SURFACE STACK YOU NEED TO INSTALL MUD CROSS WITH 3 1/16 OR 4 1/16 OUTLETS ON THE BOTTOM OF THAT YOU NEED A DSA INSTALLED THAT CAN BE FLANGED UP TO THE FLANG THAT IS BEING SHOWED ON TV BY BP JUST HAVE ROV REMOVE THE BOLTS AND NUTS THAT IS FLANGED UP TO THE CUT OFF RISER.ONCE THIS IS DONE LOWER THE SURFACE STACK DOWN EVERTHING IN THE OPEN POSTION AND SET IN PLACE AND HAVE ROV HELP GUIDE IT AND THEN LOWER AND FLANGE UP. KEEP IN MIND WE ALL KNOW THERE IS A BOTTOM HOLE PRESSUE OF 9,100 PSI + OR -. KEEP IN MIND YOU DO HAVE HYDROSTATIC PRESSURE OF SEA WATER @2158 PSI + OR - .SO THE PRESSURE THAT YOU SHOULD ONLY BE LOOKING AT IS + OR - 6942 PSI THE SURFACES STACK WEIGHT OF 60,OOO POUNDS.NOW ONCE FLANGED UP CLOSE TH BOTTOM BLIND RAMS WHICH IM SURE THE PRESSURE WELL CUT THEM OUT WHILE CLOSEING BUT THIS WELL SLOW IT DOWN ENOUGH TO CLOSE THE UPPER RAMS WITH OUT CUTTING THEM OUT OR WASHING THEM OUT.KEEP IN MIND NOW YOU HAVE THE TWO OUTLETS ON THE MUD CROSS THAT THE OIL WELL BE FLOWING THUR. ONCE THIS IS COMPLETED FLANGE UP T0 THE MUD CROSS AND PUMP KILL MUD OR BULL HEAD BRAKE DOWN THE FORMATION OR CEMENT THE DAM THING UP AND I PROMISE THIS CAN BE DONE.JUST HAVE SOME TAKE THIS BY THE DAMS HORN AND DO IT OR CONTIUE BELIVE WHAT BP IS TRYING TO SELL TO STATE OF LA AND THE GOVERINMENT.AND CONTIUE LETTING THE OIL FLOW INTO THE GULF UNTAIL RELIVE WELLS ARE DRILLED IF YOU BELIVE THAT. HERE MY RESUME TO BACK UP MY CLAM THAT I KNOW WHAT THE HELL IM TALKING ABOUT THIS IS NOT LIP SERVICES FROM ME. WHICH BP HAS SOLD THE WORLD ON IS NOTHING BUT LIP SERVICES ALL THAT BP HAS DONE HAS FAILED .keep in mind i dont know the casing design that was used on this well if i had the drilling programe i wouild know just how to and what it would tkafed to snuff ththis dam oil leak out but heres my resume to back up that i know what the hell im doing ok.

my Objective:

Position myself utilizing education and experience, with opportunities for

advancement based on performance and ability

Professional Highlights:

Energetic and conscientious professional has experience, a strong work

ethic, and a record of quality performance and achievement

Thirty five years Experience in the Oil & Gas Well Industry

Drilling Supervisor Certificate - International Well Control Forum

Murchison Drilling School

Experience with Wide Variety of Drilling Rigs and Equipment

N50 Brewster / N75 Brewster / U15 / Bethlehem / 3000 Gardner Denver

Diesel Electric / 1000 Gardner Denver / 800 Diesel Electric Rigs

Oil Well 3,000 / Kremco 750 / Dreco 1200 / Oil Well E-2,000

National 1330DE 2,000 HP / Emsco C-3 3,000 HP

National 110 UE / National 1625/ TESCO TOP DRIVE/VARCO T.D.S.#4-#9

NAT SIDE DRIVE THERE WAS ONLY ABOUT SIX IN THE WORLD

I BELIEVE PENROD DRILLING HAD THEM ALL I THINK

Extensive International Experience - UAE - Kuwait - Bahrain - Oman

Southeast Asia - Vietnam - Venezuela - Republic Of Kazakhstan - Nigeria

Extensive Experience:

In High Pressure and High Temperature Well and in long reach and high

angle holes and air drilling

SIERRA ENGINEERING

DAVIE MINYARD

DRILLING CONSULTANT

ENDURING RESOURCES LLC

HIRED DATE NOV 30, 2005 / MAY 18 2007

DRILLING CONSULTANT

PREMIER SERVICES, INC. VARNAL UTAH

TEME SIGLETON

CELL985-502-5070

HOME 985-796-9474

CHARLIE PARKER

CELL435-828-5985

HOME 361-972-3310

PIONEER DRILLING

HIRED DATE 09/05 T/11/05

RIG Manager

HELP BUILD RIG #57 IN HOUSTON TEXAS

CASPER WY AREA

PREMIER SERVICES, INC. VARNAL UTAH

FLOW BACK CREW

PREMIER SERVICES, INC. VARNAL UTAH

SALES REP

F/06/05 T/09/05

CAZA DRILLING

RIG Manager

CAZA RIG #84 RIFLE AREA WITH TOP DRIVE/RIG#54

CAZA RIG #81 & #82 VERNAL UTAH

F/12/04 T/6/05

PLASTER AND WALD CONSULTING CORP

CONSULTIING IN PANHANDLE OF TEXAS/ OKLA.

F/1104 T/12/04

ONE MONTH JOB

ST MARY OPERATIONS

CONSULTING

6 MONTH SWEETWATER OKLA.

FRED OTIS

F/ 06/04 T/11/04

UNIT DRILLING COMPANY

TOOLPUSHER

F/01/15/04 T/06/04

SWEETWATER OKLA.

Extensive Experience:

With extremely High Mud weight oil base 19,8 ppg and hemp tight 20.8

casing string weight of 1.1 to 1.5 million and high concentrated H2s from

20% To 35%

Well Accomplished in Kuwait with hand on experienced:

Wafra#1 - 12,700' / SUG#1-13,800' / KM#1-20,774' / AB#9-14,700'

MN61-16,200' / RQ115-18,000' / UG72-14,000' / WMN1-16,540

AD7-12,590 / AD10-12,590 / AD10-12,600 / UG95-13,600 / KM2-15,591

NWRA1-22,000'

Well were exploratory Drilling for the exception of AB9 / MN61 / RQ115

UG72 / UG95 Theses was Marrat Exploration Wells

Experience:

Pride International

Operation Drilling Superintendent

2002 To 2004

Area Republic of Kazakhstan and Nigeria

Santa Fe Drilling Corporation

Senior Drilling Foreman

1991 To 2002

Drilling Foreman

1996 To 1998

Driller

1991 to 1996

Fire Fighting Member in Kuwait(1991)

Member of team assigned to Boots & Coots Well Control

Utilized Various techniques to extinguish oil well fires burning after

Gulf war

Penrod Drilling Company 1985 To 1991

Driller -UAE - Oman and Bahrain (Off Shore Drilling)

Armstrong Drilling Company 1983 To 1985

Driller - Air drilling

Zenith Drilling Company 1973 T0 1983

Driller - 1977 To 1983

Derrickman - 1975 To 1977

Floorman - 1973 To 1975

History In Kuwait:

I spent ten years on Santa Fe Rig 3 we set some of the heaviest 18 5/8"

casing string in world in Kuwait on Rig#3 we was doing drilling looking for

the Pre-Kuff gas.

I personally help build Rig 186 and Rig 187 for Santa Fe Drilling in

Venezuela see all attached papers on equipment and rig I have worked on

Technical and Specialized Training

Supervisory Safety Seminar

Drilling String care and maintenance

Stop

Drilling Fluids and Solids Control

Computer Basics

Next Step In Safety

First Responder (First Aid)

Drilling Line and Ton Miles

IWCF (Supervisor)

Medic First Aid

Risk Assessment Training

Drilling Sting Training Course

Maximo (Pride)

Fire Fighting

Murchison Drilling School

Gas Testing

Boset Training

H2s Training

Randy Smith Supervisory School









By DOLMITE on   6/16/2010 10:23 PM

Your name:
Title:
Comment:
Security Code
CAPTCHA image
Enter the code shown above in the box below
Add Comment    Cancel  

  

• To Contact the Station:  985-876-3456  • To Fax the Station (Business Office):  985-876-9081  • To Fax the News Department:  (985) 853-1856 

• Mailing Address: 1202 St. Charles Street, Houma,  LA 70360

Copyright 2010 by Folse Productions, Inc.   Terms Of Use  Privacy Statement
DotNetNuke® is copyright 2002-2010 by DotNetNuke Corporation